Connecting a Lifting Station to a Soil Stack

2026-11-108 min readInstallation and Commissioning

There are two pipes on a station and only one can go into a soil stack. Which one, why the other must not, and the conditions on the vent.

Connecting a lifting station to a soil stack

There are two connections on a buried lifting station that people describe as "connecting to the stack", and only one of them is allowed.

The discharge pipe must not go into a soil stack. It is pressurised, the stack is gravity, and the two do not combine. A pump discharging into a stack will push sewage up the stack and into the fixtures above it.

The vent pipe may go into a soil stack, subject to conditions, because both are venting the same drainage system.

Most of the confusion in this area comes from not separating those two. This article separates them, explains what each connection actually needs, and covers the four conditions that apply to a vent connection.


Three different things people mean

What is being connectedInto a soil stack?Why
Discharge pipe (pressurised)NoIt would pressurise the stack and back up the fixtures above
Vent pipe (from the station)Usually yes, with conditionsBoth vent the same system
Inflow pipe (gravity, from fixtures)NoThe inflow comes from fixtures, not from a stack

The third row is worth a word: the inflow to a station comes from the fixtures it serves, and those fixtures may themselves connect to a stack — but the station's inflow is a separate gravity run, not a connection into the stack.


Why the discharge cannot go into a soil stack

A soil stack is sized and arranged for gravity flow. Sewage falls down it, air moves past it, and the whole system depends on the pipe not being full.

A pump discharge is different in three ways.

It is pressurised. The pump generates head. Feeding that head into a stack pressurises the stack, and the stack has no way to relieve it except through the fixtures connected above.

It has a non-return valve. The valve holds pressure in the discharge pipe. Between the pump and the valve, the pipe is a pressure vessel, and connecting it to a gravity stack makes the stack part of that vessel.

It can flow at any time. A stack relies on flow arriving at the top and falling. A pump can deliver flow into the middle of a stack, in any quantity, at any moment — including while the stack is carrying other flow.

The result of connecting them: sewage appears in the fixtures above the connection point. It is not a subtle failure, and it is the reason the connection is prohibited rather than merely discouraged.


Where the discharge should go instead

Three acceptable destinations, in order of preference.

1. A gravity drain or manhole outside the building. The discharge rises to a level above the receiving drain and connects into a manhole or a gully. This is the normal arrangement, and it requires the discharge to be high enough to discharge by gravity into the receiving point.

2. A dedicated discharge point into a chamber or inspection chamber. Where the receiving drain is a private one, a chamber provides access for rodding and a place to see the flow.

3. Directly into a sewer connection with backflow protection. Where the discharge enters a public sewer, a non-return valve at the connection point prevents sewer flow entering the discharge pipe.

The common requirement across all three: the discharge must terminate above the flood level of the receiving drain, or be protected against backflow. A discharge pipe that terminates below the surcharge level of the receiving sewer becomes an inflow path when the sewer is full.

Two details that matter:

The discharge needs a non-return valve at the station, and often a second one at the connection point where backflow is a risk. See Where to fit the non-return valve.

The discharge route should rise continuously to the connection point, with no local high point that traps air. See Air lock in a sewage lifting system.


The vent connection

The station has to be vented. The chamber contains sewage, sewage generates gas, and the gas has to go somewhere.

Connecting the station vent into a soil stack is usually acceptable, because both are part of the same drainage ventilation system. The conditions, in general terms:

1. The stack must be a vented stack. A stack that terminates with an air admittance valve at the top is not a route to atmosphere, and connecting a station vent into it does not vent the station.

2. The connection must be above the highest fixture connection on the stack, or arranged so that it cannot be blocked by flow from above.

3. The connection must be sized appropriately. A vent connection that is too small will not carry the gas the station produces, particularly during a pump cycle when the chamber level changes.

4. The stack must terminate correctly — above roof level, away from windows and air intakes, and with the termination clear.

Where those conditions cannot be met, the station vent has to go to atmosphere independently.

The specific rules vary by country and by building type, and the local drainage regulations govern. What does not vary is the principle: the station must vent to atmosphere, by whatever route is available.


Air admittance valves cannot replace it

This is the mistake that causes most odour problems, and it is worth being blunt.

An air admittance valve lets air in. It opens when the pressure in the pipe falls, and it closes when the pressure rises. It is a one-way device.

A lifting station needs to let gas out. The chamber generates gas continuously, and the level change during a pump cycle displaces air. An AAV fitted to a station vent will keep the gas in the chamber, and the pressure will find another route — typically the cover seal, or a fixture trap inside the building.

So: an AAV is not a substitute for a vent to atmosphere on a lifting station. It is a legitimate device for ventilating a drain branch where a full stack connection is impractical, and it has no role in venting a chamber that generates gas.

See How to vent a sewage lifting station.


Can a station share a vent stack?

Yes, in most cases, and it is often the practical solution — one penetration through the roof instead of two.

The conditions are the same four above, plus one more: the shared stack must be large enough for both. A stack sized for the drainage system may not have the spare capacity for a station's vent, particularly where the station is large or the stack is already carrying several branches.

Where a station is at development scale, a dedicated vent is normally the right answer. Where it serves one bathroom, sharing is usually fine.

See Can a lifting station share a vent stack.


The four mistakes

Discharging into a soil stack. The most serious, and it is prohibited for good reason. Sewage appears in the fixtures above.

Venting through an AAV. Keeps the gas in the chamber and pushes it out through the cover or a trap.

Venting into a stack that is itself AAV-terminated. The stack is not a route to atmosphere, so neither is the connection.

Terminating the vent too low or too close to an opening. Odour at a window is the mild consequence; the serious one is gas accumulating in a roof space or a lightwell.


Working on a real project?

Send the fixture list, not the model code

Send the fixture list, required lift height and supply voltage. We will recommend the matching model from the 2026 catalog.

FAQ

Can a sewage pump discharge into a soil stack? No. The discharge is pressurised and the stack is gravity. Connecting them pressurises the stack and backs sewage up into the fixtures above the connection point.

Where should the discharge go? To a gravity drain, a manhole or an inspection chamber, terminating above the flood level of the receiving drain, with backflow protection where the receiving sewer can surcharge.

Can the vent go into a soil stack? Usually yes, provided the stack is genuinely vented to atmosphere, the connection is above the highest fixture, the size is adequate and the termination is correct.

Will an air admittance valve vent a lifting station? No. An AAV only admits air; the station needs to release gas. Fitting an AAV to a station vent traps the gas in the chamber.

Does the station vent have to go through the roof? It has to reach atmosphere. Roof level is the usual route; a high-level wall termination away from windows and intakes is acceptable in some situations. The local regulations decide.


Next step

Tell us what the station serves, where the discharge can reach a gravity drain, and whether there is a vented soil stack the station could connect to. We will tell you which connections are permissible and what the vent needs.

Request a quotation · See the range · How to vent a sewage lifting station


Still unsure? Message the engineer on WhatsApp.

Official sources

  • GOV.UK — Building Regulations guidance on drainage and ventilation.

Links open the organisation's own website. Document numbers quoted above are the ones used in the article.

Models referenced in this note