Size commercial sewage pumps with the fixture unit method, work out total dynamic head and find the duty point. Compare Anteloy AT-S lifting stations.
Selecting a commercial sewage pump means sizing for peak flow, checking total dynamic head, and confirming the duty point on the curve. Commercial drainage peaks harder and less predictably than a single home, so design flow is calculated statistically rather than by adding fixtures. This article sets out the fixture unit method, the head formula, duty point, duplex control logic and the Anteloy AT-S range.
Why commercial drainage needs a probability-based method
Commercial buildings such as hotels, offices, hospitals and clubs do not drain like houses. Flow arrives in sharp, uncertain peaks, and fixtures are rarely used all at once. Adding every fixture's discharge rate gives a pump that is far too large; sizing on average flow lets the chamber overflow during a rush.
EN 12056-2 uses a probability-based approach instead. Each fixture is assigned a discharge unit (DU) and a statistical reduction is applied. Peak demand grows with the square root of the number of fixtures, not in proportion to it.
Three quantities drive selection: design flow, total dynamic head and the duty point. Get the flow wrong and the chamber spills; get the head wrong and the pump never reaches that flow.
Calculating peak flow with the fixture unit method
Each fixture type is given a discharge unit in liters per second. The design wastewater flow is:
Qww = K × √(ΣDU)
ΣDU is the sum of the units served; K is a frequency factor reflecting building use. Commonly used values in EN 12056-2 based design are:
| Usage pattern | Typical building | K |
|---|---|---|
| Intermittent | Residential, office toilets | 0.5 |
| Frequent | Hospitals, schools, hotels, restaurants | 0.7 |
| Crowded or concentrated | Cinemas, stadiums, public baths | 1.0 |
| Special high density | Laboratories, special industrial discharge | 1.2 |
The square root matters: doubling the fixtures raises flow by only about 40 percent. K is a design input, not a fixed clause — choose it to match actual use and record it.
Where the system also receives continuous discharge (Qc) or pumped inflow (Qp), add them:
Qtot = Qww + Qc + Qp
The station must pass Qtot at the design head, with enough margin that the chamber does not overflow at a peak.
EN 12056-2 describes how to estimate design flow; it is a calculation method, not a product certification. Anteloy AT-S stations are chosen by matching their published performance to the flow and head your project requires.
Total dynamic head: breaking down Htot
Flow alone does not size a pump. It must also generate enough head to move that flow to the discharge point:
Htot = Hgeo + H,V,A + H,V,R
Static head (Hgeo) is the vertical distance from the pump stop level to the highest point of the discharge pipe, or to the backflow level where the outlet must clear a flood rim. It does not vary with flow, so it plots as a horizontal line. Measure from the low-level switch, not the chamber rim. A longer pipe adds friction, not static head.
Individual losses (H,V,A) are local losses from valves, bends and reducers, proportional to the square of velocity, so they matter most at high flow and in small bores.
Linear friction losses (H,V,R) come from water rubbing along the rising main; they scale with length and climb steeply with flow.
Friction is the term most often underestimated. A pump chosen on static head alone may lift high enough on paper yet fail to deliver once the bends and pipe length are counted.
Finding the duty point on the curve
The duty point is where the pump curve and the system curve cross. The pump curve shows head at each flow; the system curve shows the head demanded, rising with friction from static head. Their intersection is the only flow at which pump and system agree.
For steady running, keep the duty point near the pump's peak efficiency point (BEP). Too far right, and the pump enters high flow where cavitation and overload become risks. Too far left, and it sits at high head with low flow, where recirculation and vibration shorten seal life.
Estimate head at the design flow, since friction grows with flow.
Duplex stations and control logic
Duplex stations are commonly specified for commercial buildings and multi-occupancy properties where continuity matters. Two pumps in one chamber provide standby capacity and absorb a surge without spilling.
Alternation. The controller swaps the lead pump at each start, sharing running hours and keeping the standby seal from sticking.
Changeover on fault. If the lead pump trips on thermal overload, phase loss or a sensor fault, the controller alarms and hands over to the second pump.
Parallel operation. A sudden inflow reaching the second start setting brings both pumps on; check the rising main for self-cleansing velocity in both modes.
Intermittent duty (S3). Motors are generally rated for intermittent duty: they run, then rest so the motor sheds heat. The real limit is starts per hour. Starting beyond that limit overheats the motor, so check the station's rating against the switching pattern.
Anteloy AT-S commercial selection matrix
The AT-S range of integral PE lifting stations covers small to large commercial applications. Match Maximum flow and Maximum head to the duty point, then check Free passage and tank size.
| Model | Power input (P1) | Maximum flow | Maximum head | Free passage | Tank | Protection class |
|---|---|---|---|---|---|---|
| AT-S25 | 750 W single / 1100 W three-phase | 27–32 m³/h | 11–13 m | 35 mm | 25 L | IP68, Class F |
| AT-S50 | 750 W single / 1100 W three-phase | 27–32 m³/h | 11–13 m | — | 50 L | IP68, Class F |
| AT-S60 | 750 W single / 1100 W three-phase | 27–32 m³/h | 11–13 m | 50 mm | 60 L | IP68, Class F |
| AT-S90 | 750 W single / 1100 W three-phase | 27–32 m³/h | 11–13 m | 50 mm | 90 L | IP68, Class F |
| AT-S170 | 1500 / 2200 / 3000 W | 44–63 m³/h | 15–21 m | 60 mm | 170 L | IP68 |
| AT-S460 | 1500 / 2200 / 3000 W | 44–63 m³/h | 15–21 m | 60 mm | 460 L | IP68 |
AT-S90 and AT-S170 are rated for up to 120 starts/hour. The AT-S25, AT-S50, AT-S60 and AT-S90 share the 750 W single-phase / 1100 W three-phase power input (P1) and the 27–32 m³/h, 11–13 m envelope, differing in tank size and Free passage. The AT-S170 and AT-S460 share the 1500 / 2200 / 3000 W range and the 44–63 m³/h, 15–21 m envelope; the AT-S460 offers a larger 460 L tank. A dash means no published figure; confirm before specifying.
A MEP selection checklist
When reviewing a lifting station for a commercial project:
- Flow and K. Confirm ΣDU and a K that matches use — 0.7 for a hotel, 1.0 for a public cinema — and include continuous and pumped inflow in Qtot.
- Static head limits. Run Hgeo from the pump stop level to the backflow bend or outlet, not the chamber rim.
- Self-cleansing velocity. Check the rising main in both modes, counting fittings in the friction loss.
- Redundancy and starts. Confirm standby capacity and that permitted starts per hour cover peak switching.
- Protection. Verify Protection class IP68 for submerged duty and Class F insulation where specified.
- Supply and solids. Match supply Voltage and phase to the motor rating, and check Free passage against expected solids.
To have the flow and head checked against a proposed station, send the lift, pipe run and pipe size through the quote form. We can review the duty point before you fix a specification.
Working on a real project?
Send the fixture list, not the model code
Send the fixture list, required lift height and supply voltage. We will recommend the matching model from the 2026 catalog.
FAQ
Q: Can I size a pump by adding every fixture's flow? No. Fixtures are rarely used all at once. EN 12056-2 based design assigns discharge units and a frequency factor K, so flow grows with the square root of the total units.
Q: How is total dynamic head different from static head? Static head is the vertical lift from the stop level to the discharge. Total dynamic head adds friction in the pipe and fittings. Select at the full Htot for the design flow.
Q: Why does the duty point matter more than nameplate flow? Nameplate flow is one point on the curve. Actual flow is where it crosses the system curve; if head is higher than assumed, the pump delivers less.
Q: Are two pumps legally required in commercial buildings? Duplex stations are commonly specified where continuity matters, but they are a design choice, not a universal rule; check the requirements for your project. The benefit is standby capacity and surge absorption.
Related reading
- Fixture unit method for sizing lifting devices — assigning and summing discharge units.
- How to read a pump performance curve — locating head and flow on the manufacturer's data.
- How to size a duplex sewage pump station — standby capacity, alternation and switching frequency.
Still unsure? Message the engineer on WhatsApp.