Each pump must carry the full duty, the tank must be larger than a single-pump version, and the alarm must sit above the both-pumps level. The calculation, step by step.
Sizing a duplex station is the same calculation as a single-pump station with three additions: each pump carries the whole duty, the working volume grows, and the alarm level moves up.
The mistake that causes most problems is treating the two pumps as a combined unit. They are not. One is working and one is spare, and the station has to perform on the working pump alone.
This article works through the six numbers you need, in the order that avoids rework.
Step 1: Establish the duty flow
The duty flow is the peak inflow the station must handle, not the average.
| Source | How to estimate it |
|---|---|
| Fixtures in the installation | Fixture units, converted to flow — the standard method |
| Known appliances | Washing machine, dishwasher, shower: manufacturer discharge figures |
| Tenanted or public buildings | Peak occupancy, not average occupancy |
| Grey water only | Lower peak, but check whether a washing machine is included |
Two rules that matter more than the arithmetic:
- Round up, not down. A station that is 10% oversized wastes a little energy; one that is 10% undersized runs continuously at peak.
- Use the peak that actually happens. A single bathroom in a basement flat and a bathroom serving six tenants have the same fixtures and very different peaks.
Step 2: Establish the total head
Total head is static lift plus friction, and on a duplex station the friction is calculated for one discharge train, not two.
| Component | How to get it |
|---|---|
| Static lift | Vertical height from the pump start level to the discharge point |
| Friction loss | Per-metre loss for the pipe diameter and flow, times the developed length |
| Fittings | Bends, valves, non-return valve — each adds equivalent length |
| Discharge condition | Free discharge or into a pressurised sewer |
The number you need is the head at the duty flow. Plot it on the curve: the duty point must sit comfortably inside the pump's operating range, not at the far right where efficiency falls away.
Step 3: Size each pump to the full duty
This is the step people get wrong.
Each pump must deliver the duty flow at the duty head on its own. If the station must move 12 m³/h at 6 m, both pumps are specified at 12 m³/h at 6 m — not 6 m³/h each.
| What people specify | What it delivers |
|---|---|
| Two pumps at 50% of duty | 50% on one pump, 100% only while both run |
| Two pumps at 100% of duty | 100% on one pump, 200% briefly |
The second is correct. The first is a station that works perfectly until the day it is needed.
The brief period when both pumps run is a bonus, not the design basis. It covers a genuine surge — a group of showers, a delivery to a commercial kitchen — but the station must not depend on it.
Step 4: Calculate the working volume
Working volume is the volume between the pump start level and the pump stop level. It exists to limit starts per hour.
The basic relationship:
Working volume ≥ (inflow per hour ÷ allowable starts per hour) × a safety factor
For duplex, two adjustments apply:
| Adjustment | Reason |
|---|---|
| Multiply the single-pump volume by roughly 1.3 to 1.5 | The station must hold inflow while the lead pump runs, the level falls, and the lag pump's start level is crossed |
| Set separate start levels for lead and lag | Typically a small step between them, so the lag pump only cuts in on a real rise |
Do not simply halve the volume because there are two pumps. The tank has to absorb the same inflow with more control levels packed into it, and squeezing the band causes both pumps to short-cycle — which is harder on the motors than a single pump cycling.
Step 5: Set the three levels
A duplex station has more levels than a single-pump one, and getting the order right is what makes it behave.
| Level | Function | Typical relationship |
|---|---|---|
| Stop level | Both pumps off | Above the pump inlet, so neither runs dry |
| Lead pump start | First pump on | Working volume above stop level |
| Lag pump start | Second pump on | A step above lead start |
| High-level alarm | Warning | Above the lag start, with the level still rising |
| Flood level | Emergency | Above alarm, below any overflow path |
The critical one is the alarm. On a single-pump station the alarm sits above the one start level. On duplex it must sit above the point where both pumps are already running — because that is the only condition that means the station is genuinely losing.
An alarm set below the lag pump start will sound every time the second pump cuts in, which trains everyone to ignore it. That is worse than no alarm.
Step 6: Confirm the arrangement details
These do not change the numbers but they decide whether the station is serviceable.
| Item | What to confirm |
|---|---|
| Isolation valves | One per pump, so either can be removed while the other works |
| Non-return valves | One per pump — a shared valve lets the running pump push water back through the idle one |
| Guide rails or fixed coupling | Whether pumps can be lifted out without entering the tank |
| Control panel | Alternating function, and whether it is included or separate |
| Level control | Two independent switch sets, or a combined multi-level arrangement |
| Ventilation | Sized for the larger tank |
The non-return valve point catches people out. With two pumps on one discharge header, each needs its own non-return valve. Without it, the running pump discharges backwards through the idle pump and back into the tank — the station appears to run constantly and moves very little.
Worked example
A small guest house: six en-suite rooms plus a communal kitchen, all below sewer level.
| Step | Value | Note |
|---|---|---|
| Duty flow | 9 m³/h | Peak from six showers plus kitchen |
| Total head | 7 m | 4.5 m static, 2.5 m friction over 30 m of 50 mm pipe |
| Pump specification | Two pumps, each 9 m³/h at 7 m | Full duty each, not half |
| Working volume | 240 L | Single-pump equivalent ~170 L, increased for duplex |
| Stop level | 150 mm above tank floor | Keeps both pumps submerged |
| Lead start | 240 L above stop | |
| Lag start | 300 L above stop | |
| High-level alarm | 360 L above stop | Above both-pumps running level |
| Isolation | One valve per pump | Service without shutdown |
| Non-return | One per pump | Prevents backflow through idle pump |
The numbers themselves are less important than the order: duty first, then pumps at full duty, then volume, then levels.
Common sizing errors
| Error | Consequence |
|---|---|
| Two pumps at half duty | Station falls behind whenever one pump is out |
| Same tank volume as single-pump | Both pumps short-cycle |
| Alarm below lag start | Alarm sounds routinely and gets ignored |
| One non-return valve shared | Running pump recirculates through the idle one |
| No isolation valves | Cannot service a pump without draining the tank |
| No alternating control | One pump does all the work; standby is untested |
| Sizing on average inflow | Station runs continuously at peak |
Working on a real project?
Send the fixture list, not the model code
Send the fixture list, required lift height and supply voltage. We will recommend the matching model from the 2026 catalog.
FAQ
Do both pumps need to be the same size? Yes, in almost all cases. Unequal pumps complicate the control logic and the alternating function, and the smaller pump cannot serve as standby for the larger duty.
Can both pumps run at the same time? Yes, briefly, and that is useful for genuine peaks. It should not be the basis for sizing — the station must perform on one pump.
How much bigger is the tank than a single-pump version? Roughly 1.3 to 1.5 times the working volume, depending on how much of a step you set between lead and lag start levels.
What is the minimum number of level switches for duplex? Two start levels, one stop level and one alarm — four distinct levels. Some controllers achieve this with fewer physical switches by using a multi-level float or an electronic probe.
Next step
Send the fixtures served, the vertical lift and the discharge route, and we will confirm the pump duty, the working volume and the four level settings for a duplex arrangement — or tell you if the installation is better served by a single pump with a high-level alarm.
Request a quotation · Single vs duplex stations · See the range
Related reading
- Single pump vs duplex pump stations — whether you need two pumps at all
- Fixture unit method for sizing — step 1 done properly
- Calculate total dynamic head — step 2 done properly
- How to choose tank volume — the single-pump volume calculation
- Float switch vs pressure switch vs electronic level control — how the four levels are actually switched