Sewage Pump Datasheet: What a Complete One Contains

2026-11-056 min readSelection Guide

A datasheet is a procurement document, not a brochure. The twelve fields a complete one has, the ones most suppliers leave out, and how to use it in a tender.

A datasheet — sometimes called a technical data sheet, sometimes a technical file — is not a brochure. A brochure persuades; a datasheet specifies. The difference matters because a datasheet is the document you attach to a purchase order, a tender submission or a submittal for approval — and if it is incomplete, you end up accepting whatever arrives.

This article lists the twelve fields a complete datasheet contains, which ones are usually missing, and how to use the document in a procurement process.

It applies equally to a single sewage pump station for a house and to a packaged unit going into a tender for forty.


The twelve fields

#FieldWhy it is needed
1Model code and variantIdentifies the exact unit, including voltage and platform
2Performance curveThe whole operating range, not one point
3Duty pointFlow and head at the intended operating condition
4Shut-off headThe maximum lift the pump can achieve
5Free passageThe largest solid that passes — the blockage predictor
6Impeller type and materialDetermines what the pump handles and how long it lasts
7Tank volume and working volumeSizing and cycle behaviour
8Motor dataPower, voltage, frequency, current, speed, insulation class, protection rating
9Connection sizesInlet, discharge, vent — with thread or flange standard
10Maximum liquid temperature and pH rangeDuty limits that are easy to exceed
11Weight and dimensionsFreight, handling and installation planning
12Standards and conformityWhich standard the unit is made to, and the declaration of conformity

A sewage lifting station datasheet missing any of these is a document that will cost you time later — usually at the point where you cannot answer a customer's or an inspector's question.


The three fields most often missing

Free passage

Many datasheets quote the discharge port size and leave you to assume the free passage is the same. It is not — the governing restriction is usually the gap between the impeller and the volute, which is smaller.

Ask explicitly: what is the free passage, and where is it measured? A unit with a 50 mm discharge and a 20 mm impeller clearance has a free passage of 20 mm.

Working volume

Tank volume is the headline number. Working volume — the volume between start and stop levels — is the number that determines cycle frequency.

A 90 litre tank with 20 litres of working volume cycles four times more often than a 90 litre tank with 80 litres of working volume. Same tank, very different life.

Duty rating

Whether the pump is rated for continuous or intermittent running, and at what ambient and liquid temperature. A unit rated for intermittent domestic use will not survive a commercial kitchen's operating hours, even if the flow figures match.


Reading the curve section

The curve is the most important part of the datasheet and the part most often skipped.

ElementWhat to look for
Horizontal axisFlow, in m³/h or l/min — check which
Vertical axisHead, in metres
The curve itselfShould fall from shut-off head to maximum flow
The duty pointShould be marked, or you should be able to plot yours
Efficiency or power curvesOptional, but useful for energy comparison
The stated speedA curve at 2900 rpm is not valid at 1450 rpm

The test: plot your required duty point on the curve. If it sits well to the left of the best-efficiency area, the pump is oversized. Well to the right, and it is undersized and will run hot. Either way, the datasheet has told you something a brochure never would.

Full method: how to read a pump performance curve.


Using a datasheet in a tender

If you are specifying for a project, the datasheet is what you attach to the specification so that every bidder quotes the same thing.

StepAction
1Write the duty requirement: flow, head, free passage, tank working volume
2Ask each bidder for a datasheet covering the twelve fields
3Reject any submission missing fields 2, 5 or 7 — those three decide whether the unit works
4Compare the curves at your duty point, not at their headline point
5Require the declaration of conformity as a separate document

A sewage lifting station specification written this way is short — half a page — and it removes most of the ambiguity that makes tender evaluation slow.


Datasheet versus catalogue

These get confused, and the confusion causes problems.

DocumentPurposeContent
DatasheetOne model, all technical fieldsCurves, dimensions, materials, limits
CatalogueThe whole range, for selectionSummary tables, model codes, headline figures
Technical fileThe full documentation setDatasheets, manuals, declarations, test references
SpecificationWhat you requireWritten by the buyer, not the supplier

When you ask for a sewage lifting station catalog, you get a selection tool. When you ask for a datasheet, you get a procurement document. Ask for both, and know which one you are holding.


What a complete datasheet lets you do

TaskRequires
Confirm the unit suits the dutyCurve + duty point
Predict blockage riskFree passage + impeller type
Predict cycle frequencyWorking volume + start/stop levels
Plan the electrical supplyMotor data + current
Plan the pipeworkConnection sizes and standards
Plan freightWeight and dimensions
Answer a building inspectorStandards + declaration of conformity
Order a spare partModel code + variant + parts list

If the datasheet cannot support all eight, it is incomplete.


Red flags in a datasheet

Red flagWhat it suggests
Curve with no axis unitsThe figures are illustrative
One flow figure, no headNo tested data
"Free passage: large"Not measured
Tank volume but no working volumeWorking volume is small
No speed stated on the curveThe curve may be from a different variant
Different power ratings in different documentsNo document control
No declaration of conformityCompliance is a claim, not a document

A ready-to-install sewage lifting unit with a complete datasheet is easier to approve, easier to install and easier to support than one with a brochure — and the difference is visible before you order.


Working on a real project?

Send the fixture list, not the model code

Send the fixture list, required lift height and supply voltage. We will recommend the matching model from the 2026 catalog.

FAQ

What should a sewage pump datasheet include? Twelve fields: model and variant, performance curve, duty point, shut-off head, free passage, impeller type and material, tank and working volume, motor data, connection sizes, temperature and pH limits, weight and dimensions, and standards with the declaration of conformity.

What is the difference between tank volume and working volume? Tank volume is the physical size of the tank. Working volume is the volume between the pump's start and stop levels — the water actually moved each cycle. Working volume determines cycle frequency.

Why does free passage matter more than flow rate? Because it predicts whether the pump will block. A pump with a good flow rate and a small free passage is a pump that will need clearing, regardless of how much water it can move.

Can I compare two pumps from their datasheets alone? Yes, if both datasheets are complete. Compare the curves at your duty point, then free passage, then working volume. Those three decide most of the outcome.


Next step

Tell us the duty point and the platform you need, and we will send the datasheet with the curve, free passage, working volume, motor data and declaration of conformity for the units that fit — in a form you can attach to a tender.

Request a quotation · Read a pump curve · See the range


Still unsure? Message the engineer on WhatsApp.

Models referenced in this note