Pan connector, fall, pipe diameter and vent — the four things that decide whether a toilet feeding a lifting station drains cleanly or blocks.
A toilet connects to a sewage lifting device through a gravity soil pipe that falls continuously from the pan outlet to the station inlet. The pipe is normally the same diameter as the pan spigot, the fall must be continuous, the joint at the tank must be sealed, and the branch needs to be vented — either through the station's own vent or through the stack. Get the fall wrong and solids settle in the pipe; get the seal wrong and the room smells.
The connection itself is simple. What makes it fail is the geometry either side of it.
Step 1: Confirm the pan outlet height
The pan outlet must be high enough for the pipe to fall to the station inlet. This is decided before the toilet is fixed, not after.
Measure:
- Height of the pan spigot centre above finished floor.
- Height of the station inlet centre above finished floor.
- Horizontal distance between them.
The difference in height over that distance is your available fall. If there is not enough, the options are a different pan (some have higher outlets), a lower station position, or a raised platform under the pan.
Do not solve a fall problem with a flexible connector that sags. A sagging flexible connector holds water and solids, and it is the single most common cause of a blocked toilet branch.
Step 2: Choose the pipe and the fall
| Pipe | Typical use |
|---|---|
| Same diameter as the pan spigot (commonly 100–110 mm) | Standard soil connection to a station inlet of matching size |
| Reduced diameter | Only where the station is a macerating type designed for it |
Fall: soil pipework generally needs a continuous fall of somewhere between about 1 in 40 and 1 in 110 depending on diameter and the applicable code. Steeper is not automatically better — too steep and the liquid runs ahead of the solids, leaving them behind. Check the local requirement, but the governing principle is: continuous, and within that band.
What to avoid:
- Level sections, however short.
- Back-fall, even a few millimetres, where the pipe crosses a joist.
- Long horizontal runs without support — sag develops over time.
Step 3: Make the connection at the pan
Three common methods:
Pan connector (mechanical). A flexible or rigid connector with a rubber seal that pushes onto the pan spigot and into the pipe. Fast, removable, and appropriate where the pan outlet and the pipe are not perfectly aligned.
Solvent weld. Permanent, rigid, and the most reliable where the geometry allows. Requires the correct fittings and a clean, dry joint.
Compression. Removable and reusable, good for retrofit, but the seal depends on correct tightening and on the pipe being cut square.
Whichever you use, the joint must be airtight as well as watertight. A joint that passes water but leaks air lets sewer gas into the room, and the station's vent cannot help with that.
Step 4: Make the connection at the station
The inlet enters the tank through a grommet or a sealed boss.
- Cut the pipe square and deburr it. A ragged end damages the grommet on insertion.
- Insert to the correct depth — usually marked on the grommet or stated in the instructions. Too shallow and it pulls out; too deep and it fouls the inside of the tank.
- Check the seal by running water through before the lid goes on.
This joint is one of the two most common sources of odour at a lifting station. The other is the lid gasket.
Step 5: Deal with venting
A toilet discharging into a lifting station needs air behind it, or the trap will gurgle and the flush will be poor.
Two acceptable arrangements:
- The station's vent serves the branch. The tank is vented to outside air at full bore, and the inlet pipework is sized so that the flush draws air through the tank vent. This works where the branch is short and the vent is adequate.
- The branch connects to a vented stack above the highest fixture, in addition to the station vent.
What does not work: a station vented through an air admittance valve, or a branch with no vent path at all. For the reasoning, see how to vent a sewage lifting station.
Step 6: Test before closing up
| Test | How | Pass |
|---|---|---|
| Fall | Spirit level along the pipe | Continuous fall in the correct direction |
| Joints | Fill and flush several times | No weeping, no smell |
| Flush performance | Three consecutive flushes | Trap resets, no gurgling |
| Station cycle | Watch the pump start | Starts at the set level, not before |
| Non-return valve | Watch the tank after the pump stops | Level holds |
Do this before the floor is closed or the boxing goes back. Afterwards it becomes demolition.
What changes if the station is a macerator
A macerating unit accepts a smaller inlet, often 32–40 mm, and the pan connects through a dedicated low-level or rear spigot rather than a full soil pipe.
Differences that matter:
- The fall requirement is much less demanding, which is what makes a macerator usable where a soil pipe cannot be routed.
- The pipe must still fall to the unit — a macerator does not pump its own inlet.
- The unit needs a power supply at the pan, which is a design decision, not an afterthought.
- The waste stream matters more. A macerator's cutting impeller is less tolerant of wipes and fibrous material than a station with a wide-passage pump.
For the trade-offs between the two, see macerator pump vs sewage lifting station.
The five connection mistakes
- Flexible connector sagging. Water and solids collect in the dip. Replace with a rigid or properly supported connector.
- Level or back-falling pipe. Solids settle, branch blocks, and the blockage is inside a wall.
- Pipe reduced to fit a route. The reduction becomes the blockage point.
- Unsealed inlet grommet. Odour in the room, blamed on the pump.
- No vent path. Trap gurgles, flush weak, and the station smells.
All five are visible before the job is closed up.
Which station suits a toilet branch
For a single basement bathroom drainage, a compact unit with an integrated tank covers a full fixture group. Our European Type range suits 220–240V / 50Hz installations and the American Type range suits 110V / 60Hz; the parameter tables on the model pages state the inlet and discharge port sizes so the pipework can be specified in advance — see for example AT-C600A and AT-N600B.
Where the building's discharge exceeds what a compact tank can buffer, or where the toilet serves a commercial facility, the AT-S external station range runs from 25 L to 460 L.
Working on a real project?
Send the fixture list, not the model code
Send the fixture list, required lift height and supply voltage. We will recommend the matching model from the 2026 catalog.
FAQ
What size pipe connects a toilet to a lifting station? Normally the same diameter as the pan spigot, commonly 100–110 mm. A macerating unit accepts a smaller inlet, often 32–40 mm, because it reduces the solids before pumping.
How much fall does the toilet pipe need? A continuous fall within the range your local code specifies — commonly between about 1 in 40 and 1 in 110 depending on diameter. Level or back-falling sections are the problem, not the exact gradient.
Can I use a flexible pan connector? Yes, provided it is supported so it does not sag. A sagging connector traps water and solids and is a frequent cause of blockages.
Does the toilet branch need its own vent? It needs a vent path. Usually the station's tank vent serves the branch, provided it runs to outside air at full bore. A branch connected to a vented stack above the highest fixture is also acceptable.
Next step
Send the pan outlet height, the horizontal distance to the station position and the inlet size you can use. We will confirm the model and the connection set.
Request a quotation · See the model range
Related reading
- How to install a sewage lifting station — the whole sequence
- How to connect a shower to a lifting station — the low-outlet case
- How to connect a washing machine to a lifting station — the high-flow case
Still unsure? Message the engineer on WhatsApp.