Buried and Below-Ground Stations

Where the collection tank sits below ground level and the discharge has to be lifted to a sewer above it. Selection starts from the excavation, the groundwater conditions and how the unit will be reached for service.

Access cover of a below-ground lifting station chamber
Application images are illustrative.
01Pain points

What the ground decides

The limitations on a buried station come from the site, not from the pump curve.

  • 01

    Ground load

    The tank is surrounded by backfill and may sit under a slab or a trafficked area. The surround has to carry that load without transferring it to the tank body.

  • 02

    Groundwater and ingress

    Water in the surrounding soil has to stay out of the chamber. Inlet penetrations and the access cover are the points that decide this on site.

  • 03

    Top access only

    Once buried, the unit is reached from above. The pump chamber, level control and discharge connection have to be removable through the access opening without excavation.

  • 04

    Venting and discharge route

    The discharge line and the vent have to be planned before the tank position is fixed, because both run back through the excavation.

02Conditions

Drain parameters

Tank volume
25 – 460 L
Typical lift
11 – 21 m
Typical flow
27 – 63 m³/h
Supply
220V single-phase or 380V three-phase, 50Hz
Station protection
IP68

Ranges are indicative of the application, not a guarantee; selection follows the measured site figures.

03Recommended

Models for this application

The AT-S range scales by tank volume. Single and dual pump configurations are confirmed per project.

Tank volume sets the footprint; pump configuration and power set the flow and head. Compare all six →

04Installation

Points to confirm on site

  1. 01

    Base and surround

    Prepare the base and backfill so the ground load is not carried by the tank body.

  2. 02

    Inlet level

    Check the incoming pipe fall against the start level of the selected model before the tank position is fixed.

  3. 03

    Vent and discharge

    Route the vent and the discharge line, including the non-return valve, before backfilling.

  4. 04

    Access cover

    Keep the cover clear and sized for removing the pump chamber, so later service does not require excavation.

Installation details are released with the technical file for the project. Contact us with the site conditions and we will confirm the current document status.

05FAQ

Questions for this application

How is the station reached once the tank is buried?
From above, through the access cover. The opening has to be sized so the pump chamber, level control and discharge connection can be lifted out without excavation.
What decides where the inlet enters?
The fall of the incoming pipe against the start level of the selected model. Confirm that figure before the tank position is fixed.
Does groundwater change the selection?
It changes what has to be kept out of the chamber rather than the pump rating. Send the site conditions and we will confirm the current document status for the project.

06 / Inquiry

Discuss the site conditions

Include the measured lift, pipe route and voltage so the selection is confirmed against the catalog rather than a fixture count.

Four fields are required. Adding lift height and voltage lets us confirm the correct model on the first reply.

We normally reply within 1 business day. For urgent needs use WhatsApp.

Fields marked * are required. See the privacy policy for how inquiry data is used.

WhatsApp