A quotation has seven elements and buyers check three. The exclusions clause, the validity, and the three quotes that look cheap and are not.
How to read a pump quotation
A pump quotation is a commercial document with seven elements, and most buyers check three of them.
The three that get read: the price, the delivery time, and the model. The four that get skipped are the ones that cause disputes later — the scope, the exclusions, the validity and the payment terms.
This article goes through all seven, with particular attention to the exclusions clause, which is the single most useful line on the page and the one most often written in small print at the bottom.
The seven elements
| # | Element | What to check |
|---|---|---|
| 1 | Scope | What is included — pump only, or pump, chamber, valves, panel, alarm |
| 2 | Model and specification | The duty point, materials, protection class, free passage |
| 3 | Price basis | Per unit, per set, per pallet; and the currency |
| 4 | Incoterms | Which trade term, and which named place |
| 5 | Exclusions | What is explicitly not included |
| 6 | Validity | How long the price holds |
| 7 | Payment terms | Deposit, balance, and against what document |
Two more that should be there and often are not: the lead time measured from what (order, deposit, drawing approval) and the warranty terms.
Scope: the largest single variable
Two quotations for "a buried lifting station" can differ by a factor of two purely on scope.
The scope should state whether the price includes:
- The pump, or the pump and the chamber
- The non-return valve and the isolation valve
- The level control — float, pressure switch or sensor
- The control panel, and what is in it
- The high-level alarm
- The guide rails and lifting chain
- The cover and frame
- Documentation
A price that omits the panel and the valves is not a cheaper station. It is a station minus two items that will be bought separately, at a worse price and with a compatibility risk.
The practical check: put the two quotations side by side against that list. The cheaper one usually has three blank rows.
See Sewage pump cost: what drives the price.
The exclusions clause
This is the line that determines what the price does not cover, and it is the most valuable part of the document.
Typical exclusions on a pump quotation:
- Installation and commissioning
- Electrical supply and wiring to the panel
- Civil works, excavation, concrete
- Pipework and fittings beyond the stated scope
- Freight, insurance and duties, depending on the Incoterm
- Customs clearance
- Unloading at destination
- Documentation in languages other than the quoted one
- Certification beyond what is stated
A quotation with no exclusions clause is not a quotation with no exclusions. It is a quotation where the exclusions are unstated, which means they will be discovered later and attributed to whoever is holding the document.
Where the clause is absent, ask for it in writing. It is a reasonable request and the answer is informative.
Price basis and currency
Three things to check.
The unit. Per pump, per set, per station, per pallet. "USD 480" means nothing without the unit.
The quantity basis. Many quotations are tiered — a price for one, a price for ten, a price for a container. A single price with no quantity context is a price for an assumed volume.
The currency, and who bears the exchange risk. Where the quotation is in a currency other than the seller's costs, the validity period and the currency together determine who carries the risk of a movement.
Incoterms: the element that decides who pays for what
The trade term determines where the seller's responsibility ends.
| Term | Seller pays | Buyer pays |
|---|---|---|
| EXW | Making the goods available at the works | Everything else, including loading |
| FOB | Goods loaded on the vessel at the named port | Freight, insurance, import |
| CIF | Freight and insurance to the named port | Import clearance, onward transport |
| DAP | Delivery to the named place, not cleared | Import duties and clearance |
| DDP | Delivery cleared and duty paid | Nothing beyond receipt |
Two points that cause most of the confusion:
The named place is part of the term. "FOB" without a port is incomplete. "DAP" without an address is incomplete.
The Incoterm does not cover everything. Title, payment terms and liability for delay sit outside it, and have to be addressed separately. See Incoterms for pump buyers.
Validity
Every quotation should state how long the price holds.
Three reasons it matters:
Material prices move. Castings, copper and stainless steel are commodities, and a supplier quoting a fixed price indefinitely is either building in a large margin or will not honour it.
Freight moves more. Where the term includes freight, a long validity is a real exposure.
Exchange rates move. A quotation in a currency other than the seller's cost currency carries a risk that a short validity manages.
A quotation with no validity date is not a firm offer. It is an indication, and it should be treated as one.
Payment terms
Four things to establish.
The split. Deposit and balance, or payment against documents.
What the balance is against. A copy of the bill of lading, a pre-shipment inspection report, or arrival. Each gives the buyer different leverage.
The instrument. Bank transfer, letter of credit, or something else. A letter of credit adds cost and time on both sides, and it should be a deliberate choice rather than a default.
The currency and the bank charges. Who pays the correspondent bank charges is a small line that becomes an argument.
Three quotes that look cheap
The one with the narrower scope. Pump only, no valves, no panel. It is cheaper because it is less.
The one with a shorter validity. A price that holds for seven days is a price that may not be available when the order is placed.
The one with an unclear Incoterm. "Delivered" without a named place is a price that excludes whatever the seller decides it excludes.
A fourth, less obvious: the one quoted on a duty point that was not calculated. A pump sized to the model name rather than to the head and flow is a cheap answer to a question nobody asked.
How to reply to a quotation
The efficient response is a short list of questions, which turns the quotation into a specification.
- Confirm the scope against the list above, item by item
- Confirm the exclusions in writing
- Confirm the validity and the currency
- Confirm what the lead time is measured from
- Ask for the datasheet, the drawing and the declaration for that specific model
- Ask what the payment terms are against
A supplier who answers all six is a supplier who can be ordered from. One who answers three is a supplier who will generate correspondence later.
Working on a real project?
Send the fixture list, not the model code
Send the fixture list, required lift height and supply voltage. We will recommend the matching model from the 2026 catalog.
FAQ
What should a pump quotation include? The scope, the model and specification, the price basis and currency, the Incoterm with a named place, the exclusions, the validity, the payment terms, the lead time and the warranty.
Why do two quotations for the same pump differ so much? Almost always scope or duty point rather than margin. Check whether the chamber, valves, panel and alarm are in both.
What does an exclusions clause look like? A short list of what the price does not cover — installation, electrical supply, civil works, freight, duties, clearance, unloading. Its absence does not mean there are no exclusions.
How long should a quotation be valid? Long enough to place an order without renegotiating, short enough for the supplier to stand behind it. Thirty days is common; anything indefinite should be questioned.
Is the cheapest quotation the best value? Only if the scope and the duty match. A cheaper quote for less equipment is not a cheaper station.
Next step
Send us the quotation you have and we will go through it against these seven elements, tell you what is missing and what the exclusions mean for your installed cost. If you would rather start from a specification, send the duty point and we will quote against it.
Request a quotation · See the range · Incoterms for pump buyers
Related reading
- Sewage pump cost: what drives the price — what is inside the number
- Incoterms for pump buyers — the trade terms in detail
- Questions to ask a sewage pump supplier — the wider due diligence
- Pump documentation checklist for buyers — what should come with the order
- Sewage pump installation cost — the cost the quotation does not include
Still unsure? Message the engineer on WhatsApp.
Official sources
- International Chamber of Commerce — the Incoterms rules referenced on the delivery line.
Links open the organisation's own website. Document numbers quoted above are the ones used in the article.
Read more
- Read more:Incoterms for Pump Buyers
- Read more:Pump Documentation Checklist for Buyers
- Read more:Quality Control Checks Before Shipment